Commissioning; Unpacking; Installation And Connection; Tower - Bosch 1 687 023 689 – 692 Instrucciones De Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 31
en
18 | 1 687 023 689 – 692
1 687 023 691
Fig. 9:
Connections 1 687 023 691
1 Serial COM 1 / COM 3
2 USB (USB 2.0)
3 Serial COM 2 / COM 4
1 687 023 692
1
2
3
Fig. 10:
Connections 1 687 023 692
1 Serial COM 1 / COM 3
2 Serial COM 2 / COM 4
3 USB (USB 2.0)
|
1 689 989 190
2018-02-24
4.
4.1
1. Unpack the PC.
2. Check the scope of delivery.
3. Dispose of the packaging materials in the proper
1
manner.
2
4.2
3
i
The PC is supplied already installed and connected
in most Robert Robert GmbH products. Proceed
as described below if a PC has to be installed on
commissioning or if an existing PC is to be replaced.
Otherwise this Section can be ignored.
1. Disconnect the PC from the power supply.
2. Remove the covers.
3. Disconnect the connecting cables from the old PC.
4. Remove the old PC.
5. Fit the new PC.
6. Connect the connecting cables to the new PC.
7. Fit the covers.
4.2.1
Fig. 11:

Commissioning

Unpacking

Installation and connection

Tower

Installation position of tower in trolley
Robert Bosch GmbH

Publicidad

Tabla de contenido
loading

Tabla de contenido