Probe-Electrode Positioning; Gas Feeding Line - Riello 40 Instrucciones De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3.2 PROBE - ELECTRODE POSITIONING
~
Probe
D5104

3.3 GAS FEEDING LINE

1
1
– Gas supply pipe
2
– Manual cock (supplied by the installer)
3
– Gas pressure gauge (supplied by the installer)
4
– Filter
5
– Gas pressure switch
6
– Safety valve
7
– Pressure governor
8
– Adjustment valve
M1 –
Gas-supply pressure test point
M2 – Pressure coupling test point
GAS TRAIN ACCORDING TO EN 676
GAS TRAIN
TYPE
MBDLE 407 B01
The gas train is supplied separately, for its adjustment see the enclosed instructions.
2737
47
mm
2
3
M1
CONNECTIONS
CODE
INLET
3970076
Rp 3/4
Ignition electrode
Diffuser
2
WARNING
4
5
6
7
OUTLET
Rp 3/4
Natural gas and LPG
4
GB
Ionization probe
Electrode
3
3
mm
8
D5099
USE
=
M2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fs153756803

Tabla de contenido