Garland HARVEST 962 NRQG Manual Do Operador página 43

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
Mudguards support installation
A
C
Install the outer mudguards fixing them with the
screws provided.
3
3
2
2
1
1
6.2.3. ASSEMBLING THE MILLING CUTTERS
Warning! The cutting edge of the blade must be in
the direction of the rotation of the milling cutters.
B
D
3
3
2
2
1
1
1
Install the double blade helix inside the single helix
blades fixing them with the pins and clips provided.
On the outside, place the plant protection plates fixed
with the pins and the snap ring.
6.2.4. INSTALLATION OF THE SPUR
Attach the spur (1) by passing the bolt (3) through the
chassis of the machine (2) and fix it by means of the
pin (4). Place the deep RAM (5) through the spur (1)
and insert the pin (6) at the desired height, fixing it
with the pin (7).
7
6
5
6.2.5. TRANSPORTATION WHEEL ASSEMBLY
Place the machine horizontally with the weight on the
blades and the tilling unit.
43/180
English
1
3
2
4

Publicidad

Tabla de contenido
loading

Tabla de contenido