INSTALLATION INSTRUCTIONS
7. Remove bottom track (A) and tape from the top
IURQW OHGJH RI WKH VKRZHU 8VH D YDFXXP FOHDQHU
(not included) to remove any debris and wipe the
area with a soft, damp cloth. Note: Make sure not
to erase the pencil marks.
8. Apply 100% silicone sealant (not included) in
the groove on the underside of the bottom track
(A). Align and secure the bottom track (A) to the top
front ledge of the shower along the marked loca-
WLRQV 8VH WDSH WR VHFXUH WKH WUDFN LQ SODFH ZKLOH WKH
silicone dries.
9. Install the side bumpers (BB) into the vertical
side tracks (B) using the anchor screws (CC). Attach
screw cap covers (DD) over the anchor screws (CC).
Hardware Used
BB
Side bumpers
Anchor screws
CC
Screw cap covers
DD
7
8
A
9
B
BB
CC
DD
x 6
x 6
x 6
Lowes.com
8
INSTALLATION INSTRUCTIONS
10. Measure distance "b" from wall to wall at the
top of the vertical side tracks (B). Subtract 1/32 in.
from the measured distance and mark correct spot
on top track (C). Cut along the mark with a
KDFNVDZ DQG PLWHUER[ QRW LQFOXGHG 8VH D ¿ OH
(not included) to remove any sharp edges, making
VXUH QRW WR VFUDWFK WKH RXWVLGH ¿ QLVK
11. Position the top track (C) over the vertical side
tracks (B). 6OLGH WKH WRS WUDFN & GRZQ WR ¿ W VH
curely on top of the vertical side tracks (B).
A
Note: Either side of the top track (C) can face
outward.
12. Remove the preassembled screws from the
glass hanger bracket (EE).
Save the hardware (including the plastic bushings
released) for future steps.
Hardware Used
EE
Glass hanger bracket
10
B
B
b
cut line
C
b
11
C
B
B
12
EE
SCREWS
x 2
%86+,1*6
Lowes.com
9
1/32 in.
"b" mark