16. INSTALLING THE GREASE BUCKET
Parts Required:
1
x
Grease Bucket (#25)
Installation:
•
Place the Grease Bucket on the spout hook on the end of the Main Barrel.
Ensure it is level to avoid grease spills.
•
The unit is now completely assembled.
17. CONNECTING TO A POWER SOURCE
NOTE: Before plugging your Pit Boss
the temperature dial is in the OFF position.
•
STANDARD OUTLET
This appliance requires 110-120 volt, 60hz, 250w, 5 amp service. It must
be a 3-prong grounded plug. Ensure grounded end is not broken off
before use. The control uses a 5 amp, 110-120 volt, fast-blow fuse to
protect the board from the igniter.
•
GFCI OUTLETS
This appliance will work on most GFCI outlets, with a recommended
size of 15 amp service. If your GFCI outlet is highly sensitive to power
surges, it will likely trip during the start-up phase of operation. During
the start-up phase, the igniter draws 200-700 watts of electricity, which
can be too much power for a GFCI outlet to handle. Each time it trips, it
increases in sensitivity. If the GFCI keeps tripping, replace the outlet or
change to a non-GFCI outlet.
ON THE ROAD
•
Disconnect the igniter from the main wiring harness. Use the manual
start-up procedure. A Pit Boss
inverter plugged into your automobile outlet. To use the automatic
igniter, it is recommended to use a minimum of a 1000 watt inverter.
IMPORTANT: Disconnect unit from power source when not in use.
Refer to Owner's Manual for Operating Instructions.
10
into any electrical outlet, ensure
®
unit can operate using a 12 volt, 100 watt
®
16
17
FAST-BLOW FUSE,
5 AMP
25