Installing Grease Bucket; Connecting To A Power Source - Navigator PB850G Guía De Montaje

Parrilla y ahumador de pellets de madera
Ocultar thumbs Ver también para PB850G:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

16. INSTALLING THE GREASE BUCKET
Parts Required:
1
x
Grease Bucket (#25)
Installation:
Place the Grease Bucket on the spout hook on the end of the Main Barrel.
Ensure it is level to avoid grease spills.
The unit is now completely assembled.

17. CONNECTING TO A POWER SOURCE

NOTE: Before plugging your Pit Boss
the temperature dial is in the OFF position.
STANDARD OUTLET
This appliance requires 110-120 volt, 60hz, 250w, 5 amp service. It must
be a 3-prong grounded plug. Ensure grounded end is not broken off
before use. The control uses a 5 amp, 110-120 volt, fast-blow fuse to
protect the board from the igniter.
GFCI OUTLETS
This appliance will work on most GFCI outlets, with a recommended
size of 15 amp service. If your GFCI outlet is highly sensitive to power
surges, it will likely trip during the start-up phase of operation. During
the start-up phase, the igniter draws 200-700 watts of electricity, which
can be too much power for a GFCI outlet to handle. Each time it trips, it
increases in sensitivity. If the GFCI keeps tripping, replace the outlet or
change to a non-GFCI outlet.
ON THE ROAD
Disconnect the igniter from the main wiring harness. Use the manual
start-up procedure. A Pit Boss
inverter plugged into your automobile outlet. To use the automatic
igniter, it is recommended to use a minimum of a 1000 watt inverter.
IMPORTANT: Disconnect unit from power source when not in use.
Refer to Owner's Manual for Operating Instructions.
10
into any electrical outlet, ensure
®
unit can operate using a 12 volt, 100 watt
®
16
17
FAST-BLOW FUSE,
5 AMP
25

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1052710547

Tabla de contenido