!
IMPORTANT: BC 0306 and BC 0406. The facucet cannot be installed on the bathtub. it
must be mounted to the wall. Read the manufacturer's instructions for installation details.
Use the 4 levelers supplied to ensure the tub is level. The 4 levelers
4
must touch the ground to ensure thet the tub will not shift or move.
When adjusting the levelers, allow a slight clearance (1/8")
between the finished floor and the apron.
Note: Use a level to ensure accuracy
IMPORTANT: BC 0206 and BC 0306.
4
A rear mounting bracket is included with these models.
Attach the bracket horizontally to the existing structure at
the requisite height.
!
1. Rear deck of tube.
2. Rear reinforcement.
3. Existing vertical structure.
4. set the back of the bathtub on the bracket.
ATTENTION: To keep the back ledge from bending and prevent water
accumulation, it is essential to install the bracket provided or a comparable one.
Tile Flange: Place the bathtub so that the tile
5
flange rests against the existing wall structure.
Install the gypsum plasterboard or cement panels
so they just the tile flange.
Connect the bathtub drain to the floor drain. Hook up the water to the faucet. Check that all
6
connections are waterproof.
Do a silicone joint pressure seal between the base of the bathtub and the floor. The sealer
7
abdolutely must penetrate thoroughly beneath the rim of the apron. This will ensure taht no
water seeps underneath the bathtub, while also supporting the tub apron.
6
P. 8
.
1. Deck of tub
2. Existing vertical structure
3. Gypsum plasterboard panel
4. Tile flkange
5. Finishing
6. Pressure seal
7
Montréal - Canada | 1-888-536-9001 | www.wetstyle.com | November 2019
Installation guide
1
2
3
5
cross section
3
5
6
1
4
4
2