Installation Instructions
INSTALLATION REQUIREMENTS
The SL151 has been designed to be mounted either recessed
into a ceiling, or flush-mounted in a finished ceiling.
Power Requirements
The SL151 requires 120VAC, 60 Hz and 12 amps power to
operate.
IMPORTANT ! :
Installation and maintenance of this product
must be completed by a qualified service technician.
Pre-Test Lift before Installation
1.
Carefully inspect the SL151 for any shipping damage. If any
damage is apparent, do NOT continue with the installation.
Instead, contact Chief for further instructions.
2.
Place SL151 upside down on clean surface. (See Figure 1)
Figure 1
3.
Remove and save two screws holding side electrical cover
in place. (See Figure 2)
4.
Remove electrical cover. (See Figure 2)
Remove and save
two screws
Test cord
4
Electrical
Cover
3
Figure 2
5.
Place the jumper wire (H) on the external wiring terminal
contacts labeled 2 and 5, and wire the push button
assembly (D) to contacts 1 (red) and 6 (black). (See
Figure 3).
SL151 Top
Remove cover
External
wiring terminal
x 2
Place jumper wire (H) (2 and 5)
Wire push button assembly (D) (1-red, 6-black)
Figure 3
6.
Plug in the SL151 test cord. (See Figure 2)
NOTE:
(See Figure 2) for location of external wiring terminal.
(See Figure 4) for location of internal wiring terminal.
Internal
wiring terminal
Figure 4
Power Requirements and Wiring
The SL151 requires 120VAC, 60 Hz and 12 amps power to
operate.
IMPORTANT ! :
This product must be grounded. If it should
malfunction or break down, grounding provides a path of least
resistance for electric current to reduce the risk of electric
shock.
Grounding Instructions
This product is equipped with a test cord having an equipment-
grounding conductor and a grounding plug. The plug must be
plugged into an appropriate outlet that is properly installed and
grounded in accordance with all local codes and ordinances.
SL151
[Some parts not
shown for clarity]
5