dirna Bergstrom BYCOOL BLUE LINE SCANIA PGR FLAT Instrucciones De Montaje página 18

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

FLAT
EN
Assembly
Recommendations
• Before starting assembly, please read instructions and
follow them during installation process.
• Use the adequate tools for each operation.
Electricity
• Disconnect ignition key.
• Disconnect battery before starting assembly.
• Make sure electric components are securely connected,
checking their correct fitting.
! Warning
When installing the evaporative unit in the ceiling,
protect the upper part of the cabin with a cloth or sheet
to prevent scratching. When installing Bycool Flat
in the ceiling, bear in mind that cabins are normally
fitted with a hatch and have a structure which can
withstand the weight of the unit. However, if this is
not so and it is necessary to open up the ceiling, or
should the hatch material not be sufficiently resistant
(e.g. fibre, plastic, etc) the installer must decide,
under his sole responsibility, on the need to
reinforce the ceiling in order to prevent deformation,
breakage, incoming water, etc, and use the means
necessary to this end.
Torx wrenches set
Allen wrenches set
Open-jawed spanner 10, 13, 14
Scissors
Flexo-meter
Documentation included
Mounting instructions
User's guide
Troubleshooting
Warranty
Fragile
Beware of cuts!
Electrical hazard
!
Piece 20 of the listing of provided pieces must be
replaced every 12 months.
!
Dirna Bergstrom, s.l. shall not be responsible for
breakdowns or damages coming from an inadequate
handling or installation of the equipment or from mo-
difications and substitutions carried out without our
express and written authorisation.
!
Please see product warranty procedure included in
Troubleshooting.
!
Please see equipment User's Guide for its correct
functioning of the remote control and control
panel.
18
Tools
220.AA3.5210
220.AA7.0003
220.AA7.0004
220.AA1.0010
Symbology
! Warnings
®

Publicidad

Tabla de contenido
loading

Tabla de contenido