GB, US, CA: Safety instructions
¨
Please follow these safety instructions.
Installation, initial start-up, inspection, maintenance and repairs must be carried out by a compe-
tent person (heating engineer/service contractor).
Before work is undertaken on the equipment/heating system, the mains voltage must be switched
off (e.g. at the separate fuse or a mains electrical isolator) and measures taken to prevent it from
being switched on again.
On gas-fired systems, close the gas shut-off valve and make secure to prevent unauthorized
opening.
Check gas soundness after installation.
It is not permitted to carry out repairs on parts which serve a safety function.
Defective parts must be replaced with the corresponding Viessmann proprietary components or
equivalent parts approved by Viessmann.
Install the components with new gaskets.
Subject to technical modifications!
38
5832404_2018-08.indd 38
17.08.2018 07:16:27