THE APPLIANCE BASIC PARTS (see page 1. fig. 1)
1
Blower
2
Thermostat knob
3
Blower switch
4
Double switch -(ON/OFF)
5
Thermometer
2 ― THERMOSTAT KNOB. The temperature is controlled using the thermostat knob by
turning it to one side or the other.
3 ― BLOWER SWITCH. Opening the door, the blower 1 switches off.
4 ― ON / OFF SWITCH FOR LIGHT. By pressing the button of the double switch 4 with
the arrow „downward", the luminaire 9 may be switched on. By pressing the other
button with the arrow "upwards" the luminaire of the promotional shield may be
switched on.
INSTALLATION AND OPERATING CONDITIONS OF THE
Preparing the appliance for operation
It is recommended to prepare the appliance for operation with a helper.
Remove boards of foamed polystyrene from the top and the bottom of the appliance.
They are intended for transportation only. Remove adhesive tapes and open the door.
In case of moving the appliance to another place, lift its front in such a way that its
supports couldn't touch the floor.
Take out the plug with the supply cord 10 from the water tray 11 (see page 1,
fig. 1) which is placed under a compressor (this is intended for transportation
only. When the appliance is running, the cord can't be in the tray. The
appliance should not be connected to the mains until all packing and
If the appliance is brought in from the cold (temperature is not higher than +12
°C), you should wait for two hours before connecting it to the mains.
6
Adjustable height shelves
7
Thaw water channel cleaner
8
Advertising panel (ADN221 C)
9
Interior light
10
Supply cord
11
Thaw water drip tray
APPLIANCE
transport materials aren't removed. Suitably dispose the
packaging material
Take out two supports 1 from a
bag and screw them by screws 2 into
marked places at the back of a
appliance.
Take out the cover 1 from the bag and
insert the cover into the grid 2 placed
under the door.
It is permissible the conversion of the shelf 2.
Maximum conversion of the shelves is obtained by
lowering front holders 1 by five step.
8