Descargar Imprimir esta página

SEA SURF 250 Manual Del Usuario página 5

Publicidad

Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
GATE ARRANGEMENT
You must do some checks on the gate to see if fitting a SURF system is possible:
A.(Make sure that) the fixed and moving parts of the gate are strong and non-deformable;
B.the length of each gate leaf must not exceed 3,5 m for SURF 350/350 24V/350 Reversible and 2,5 m for
SURF 250/250 24V, always respecting the graph;
C.the weight of each gate leaf must not exceed 300 kg for SURF 350/350 24V/350 Reversible and 250 kg
for SURF 250/250 24V always respecting the graph;
D.The hinges and general structure must be in good conditions and the gate must move smoothly
throughout its whole travel;
Where possible, it is advisable to install limit switch stops on the ground for a good functioning of the
operator.
Inside Opening Installation
16
67411010
®
Mechanical stop
in opening
outside
inside
Outside Opening Installation
Fig. 7
Rev. 09 - 07/2013
Fig. 6
Mechanical stop
in closing
outside
inside
SURF
English
English
Fig. 8

Publicidad

loading