Installation - Brooks Instrument Sho-Rate Serie Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 49
Section 2 Installation
®
Brooks
Sho-Rate

2-6 Installation

2-2
TM
Models 1350G/1355G
Upon removal from storage, a visual inspection should be conducted to
verify the condition of equipment is "as received". If the equipment has
been in storage for an excess of two (2) years or in conditions in excess of
those recommended, all pressure boundary seals should be replaced and
the device subject to a hydrostatic/pneumatic pressure test to 150% of
rated pressure.
The flowmeter should be mounted within 6° of true vertical. The inlet
connection to the flowmeter is in the bottom end fitting. The connections
are normally horizontal, female NPT. Be sure the piping is adequately
supported to prevent undue strain on the meter.
Installation and Operation Manual
X-VA-1350G-eng
Part Number: 541B205AAG
September, 2017

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sho-rate 1350gSho-rate 1355g

Tabla de contenido