Enso Sleep Systems PB575 El Manual Del Propietario página 12

Tabla de contenido

Publicidad

installation guide
STEP 6
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure
that the Power Supply and all attached
cords are directed toward the desired
surge protector.
STEP 7
Carefully flip the base over on to
its legs. Important: Two people are
required to move the bed base. Do
not drag across the floor. Do not
rest frame on its side, excessive
pressure may damage the legs.
STEP 11
Slide the left side of the mattress retainer bar into the bracket.
Pull the retainer bar to the opposite bracket and secure the right
side.
For customer support, visit www.ergomotion.com or call: 1-844-534-3676
10
STEP 12
Plug the power cord into a power source.
A surge protector is recommended.
STEP 13
Locate the wireless
remote and insert 3
AAA batteries.
Setup is now complete! Test all functions on remote.

Publicidad

Tabla de contenido
loading

Productos relacionados para Enso Sleep Systems PB575

Tabla de contenido