Syncing Two Bases - Enso Sleep Systems PB575 El Manual Del Propietario

Tabla de contenido

Publicidad

syncing two bases (optional)
A Sync Cord is included with Twin Long and Split King bases only. Not available on Queen, Full or Full-Long size
bases. The Sync Cord connects the two control boxes to a single remote for the synchronization of two bases.
STEP 1
Unplug base from power source.
STEP 2
Disconnect the power-down box from the control box or splitter
cable. Make note where the cable was plugged in.
STEP 3
Connect the male end of the sync cord to each control box or
splitter cable. Insert it into the same port you disconnected the
power-down box from in Step 2.
14
Control Box
Bed A
Sync Cord
Powerdown box
STEP 4
Connect each power-down box male connection to the sync
cord female connection (Refer to the illustration below).
STEP 5
Plug base back into the power source.
STEP 6
Check to ensure all cords are securely attached. Both remotes
will now operate both bases simultaneously (If the remotes
become unpaired, see page 12).
Control Box
Bed B
Powerdown box

Publicidad

Tabla de contenido
loading

Productos relacionados para Enso Sleep Systems PB575

Tabla de contenido