Operation Instruction - ORILUX THP05NP Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

into the hole and clip it well, and then connect a pipe to drain the condensation
water out.
B.Wiring
1) Connect to appropriate power supply, the voltage should comply with the rated
voltage of the products.
2) Earth the machine well.
3) Wiring must be handled by a professional technician according to the circuit
diagram.
4) Set leakage protector according to the local code for wiring (leakage operating
current ≤ 30mA).
5) The layout of power cable and signal cable should be orderly and not affecting
each other.
C.Switch on after finishing all wiring construction and re-checking.
VI. Operation instruction
Power on/off
HEAT
Down-ALLOW
40
Shows the heat mode has been set
Set required temperature
Water Temp setting
Power On/Off

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

El 011972

Tabla de contenido