1. Installation of first Trick Tension Anchor
3. Installation of X14 Module Webbing on first Anchor
2
1.2
3.2
3.1
B
FRONT
1.1
1
D
E
B
E
A
REAR
3. Installation of X14 Module Webbing on first Anchor
4. Apply initial tension using the second TRICK TENSION ANCHOR
4. Applying initial tension with the second Trick Tension Anchor
4.1 Go to the second Trick Tension Anchor on the other side and pull the ratchet extention
3.2
3.1
release lever (D) and unfold ratchet lever extension (E) 180° until it locks in place.
4.2 Release ratchet lever (G) by pulling on the safety handle (F)
4.1
4.2
D
E
4.3 Thread webbing (H) through drum slot (I) of ratchet
4.4 Create as much pretension as possible by pulling hard on the excess webbing. Hold
D
E
E
this tension and apply the ratchet lever handle (G) until the ratchet drum is coiled up to a
maximum of two and a half rotations.
E
4.5 Release the safety lever (F) and close the ratchet lever (G)
4.6 Close the ratchet lever extension (E) by pulling on the ratchet lever extension release
4.5
handle (D) and fold the extension 180° until it locks into position.
4. Applying initial tension with the second Trick Tension Anchor
F
4.1
4.2
G
D
E
E
4.5
F
G
5. Finalizing the tension by using the first TRICK TENSION ANCHOR:
5.1 Apply the ratchet lever (G) with a maximum of two and a half rotations on the coil. Tip:
Thread the excess webbing as illustrated to have both hands for tensioning and to ensure
avoiding the webbing from jamming or coiling not straight.
5.2 Release the safety lever (F) and close the ratchet lever (G)
5.3 Close the ratchet lever extension (E) by pulling on the ratchet lever extension release
handle (D) and fold the extension 180° until it locks into position.
1.3
C
C
F
G
F
F
G
G
4.6
F
G
4.6
2. Installation of second Trick Tension Anchor
2.1
A
3.3
I
3.3
I
4.3
I
H
E
D
4.3
I
H
E
D
2.3
2.2
B
1
FRONT
3.4
H
B
REAR
G
1
3.4
H
4.4
G
4.4
MANUAL - ENGLISH
C
2.5
MAX
G
2.5
MAX
G