BATTERY INSTALLATION
EXPLODED DIAGRAM
INSTALLATION CHART
Step
Procedure/Part name
BATTERY INSTALLATION
1
Battery breather hose
2
Battery
3
Battery positive lead (red)
Bolt 6 × 12 mm (0.24 × 0.47 in)
4
5
Battery negative lead (black)
Bolt 6 × 12 mm (0.24 × 0.47 in)
6
7
Band
Q'ty
Follow "Step" order for installation.
NOTE:
1
Charge the battery before installing it. Refer to
1
"PREDELIVERY CHECK".
1
1
1
1
1
CAUTION:
Make sure that the battery breather hose is
not pinched.
– 9 –
Service points
E