Conant JEFFERSONIAN WV1LFB Instrucciones De Ensamblaje página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
JEFFERSONIAN KINETIC WIND VANE
2. Place the base on the
deck and align the three
base holes with the three
newly drilled holes. Use a
Phillips screwdriver to
screw each of the three
screws into the deck. Be
careful not to tighten the
screws completely.
4. Use the Allen wrench to tighten the two set screws on the base. Then nish tightening the wood screws so they are completely secure in
the mounting surface.
5. Follow steps six through nine for Ground Mounting to nish assembling the Kinetic Wind Vane.
*NOTE: Plastic expansion plugs have been included if you wish to mount the Kinetic Wind Vane to a concrete surface.
Questions? Problems? Before returning your product to the store, please give our customer service team a chance to help. Call us toll free at
1-800-638-0428 from 8:30am to 5 pm EST or email us at support@conantcollections.com for prompt resolutions to questions regarding
operation, parts or repair of your Conant product.
214 Eastern Avenue, Annapolis, MD 21403
Base
Rotor Cup Set
Telescoping Poles
Foundation Rod
www.conantcollections.com
3. Insert the foundation
rod into the top of the
base. Then screw the
level onto the top of the
rod to verify that it is
plumb. If the unit is not
level, use at pieces of
wood (shims) to slide
under the base. When
you are done, unscrew
Shims
and remove the level.
Directional Arrow Set
Base
800-638-0428
support@conantcollections.com
Foundation
Rod
Base
3

Publicidad

Tabla de contenido
loading

Productos relacionados para Conant JEFFERSONIAN WV1LFB

Tabla de contenido