Measures to be taken before start-up
DANGER
Risk of explosion! Only refill diesel oil or light fuel oil. Unsuitable
fuels, e.g. petrol, are not to be used.
Refill fuel tank.
ATTENTION
Hot water operations without fuel will cause damage to the fuel
pump. Ensure adequate fuel supply before starting hot water op-
erations.
Figure 3 - Pos. 14
Note: The EASY!Lock system joins components with a quick-fas-
ten thread solidly and securely with just one turn.
Connect the high pressure hose with the hand-spray gun and
the spray pipe and connect it to the high pressure outlet of the
appliance or the high pressure pipe network.
a
Fasten the nozzle mouth-piece (b) with the union nut (a) on
the spray pipe (d). Please ensure that the sealing ring (c) is
cleanly positioned in the nut.
Anti-calcification measures
b
c
a
Remove spring (c) from the lid support (b) of the softener tank
(a).
Fill the tank with Kaercher softener liquid RM 110 (Order no.
2.780-001).
DANGER
Dangerous electrical voltage! Setting may only be done by an
electrician.
Determining the hardness of tap water:
– through the public water supply works,
– using a hardness tester (order no. 6.768-004)
Remove the appliance cover.
Open the switch box at the operating panel.
36
b
c
d
Set the speed potentiometer (a) according to the water hard-
ness. You can refer to the correct setting in the table.
Example:
For a water hardness of 15 °dH, set 6 on the value scale of the
speed potentiometer. This results in a pause of 31 seconds, i.e.
the solenoid valve will open briefly every 31 seconds.
Water hardness (°dH)
Scale on the speed potenti-
ometer
Pause (in seconds)
Adjusting the operations stand-by time
The operations stand-by time is set on the larger plate on the left
side-wall of the electrical cabinet.
The operations stand-by time is set in the factory to a minimum
time of 2 minutes and can be increased to a maximum time of 8
minutes.
15
-
EN
5
10
15
8
7
6
50
40
31
S2
8 7 6 5 4 3 2 1
min.
max.
a
20
25
5
4.5
22
16