INSTALLATION DIAGRAM
Section 5
1. Draw a straight line by a measuring stick starting from the surface of the cooker or hob
to 990 mm (700+280). If you want to save a space of 700 mm between the cooker or
hob and the lower surface of the cooker hood. Align the drawn line to the right and left
edges. Draw a 67,5 mm axis line from aligned center to every two sides. Make a hole
by 6 mm diameter electrical drill through two drawn points. Insert the expansion bolt
and install the hanger.
NOTE: You can adjust the height of the chimney, according to the place of installation.
1st Operation: Expansion bolt;
2nd Operation: Chimmey connection metal sheet;
3rd Operation: Hanger;
4th Operation: Inner chimmey;
5th Operation: Outer chimmey;
6th Operation: Exterior body;
7th Operation: Adapter;
8th Operation: Slat screw.
26