Installation And Use; After Use - arjo Enterprise ENT-ACC07 Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 12

Installation and use

Insert the base of the syringe pump holder into either of the sockets (1) at the head end of the bed.
Twist the pole so that the notch (2) locates over the pin at the bottom of the socket.
A syringe pump or other equipment (maximum weight 10 kg) can be clamped onto the pole. The hooks
can be used to support fluid bags and other IV equipment, up to a maximum weight of 2 kg on each
hook.

After use

Remove all equipment from the pole and hooks, and pull the pole vertically out of the socket.
A clinically qualified person should assess the risks involved before transporting a
patient while IV equipment is in use.
When moving the bed, do not allow the syringe pump holder or associated equipment
to come into contact with surrounding objects or people as this may cause injury
and/or equipment damage.
Do not use the installed syringe pump holder to move or manoeuvre the bed.
When the syringe pump holder is installed, the head end panel should only be removed
after assessment by a clinically qualified person, as the gap between the pump holder
and safety side constitutes a potential entrapment hazard.
2
WARNING
1
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido