Descargar Imprimir esta página

Hardware Installation; Technical Information - Teltonika BAT120 Guia De Inicio Rapido

Publicidad

1. Connect Teltonika Networks device power input (PWR) with BAT120 power output (OUT PWR) using provided
4-pin to 4-pin cable.
2. Connect PSU 4-pin plug to BAT120 power input (IN PWR) to power up BAT120 and the end device.
1. Set On/Off slider located on BAT120 front panel to On state.
2. Connect provided PSU to IN PWR socket.
3. As BAT120 starts charging, it will also power the Teltonika Networks device connected to the OUT PWR socket.
Input voltage range
Output voltage in passthrough mode
Output voltage in battery mode
Max output power/current in battery mode
Battery capacity
Working temperature
Power adapter
Power cable
*Order code dependent.
This device is equipped with a lithium-ion cells. Do not open the casing to avoid cell damage or other hazards.
It is strictly forbidden to dismantle, squeeze, pierce, insert any foreign object and short circuit BAT120, or expose it
to liquids, fire or environments where the temperature is above 60ºC.

HARDWARE INSTALLATION

BAT120 CHARGING

TECHNICAL INFORMATION

Technical specifications
9 – 30 VDC
9 – 30 VDC
12 VDC
22 W/1.8 A
2300 mAh
0 ºC to 45 ºC
Bundled accessories specifications*
Input: 0.45 A@100-240 VAC, Output: 12 VDC, 2 A, 4 pin plug
4-pin to 4-pin power cable 4 x 0.2 mm
WARNING
(24 AWG), 1000 mm
2

Publicidad

loading