Choosing The Site; Line Selection; Routing The Connecting Cable - EMobility eClick Instrucciones De Instalación

Para ebox smart, professional y touch
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 111
50
eClick installation instructions

Choosing the site

Consult the customer concerning the choice of a suitable
site. The optimal site for the charging station depends on
the owner's needs and the parking and wiring environment.
The eClick can be mounted on a wall or on the ePoleDuo,
depending on the customer's needs. Ensure that the
mounting surface is adequate for the installation and we
recommend a minimum compressive strength rating of
SFK 12 when mounting to bricks.
Danger
Do not install in and around
ex-zones!

Line selection

When selecting the cable, the valid, international, country-
specific and regional regulations and standards must be
observed. When selecting the cable, the connection to a
three-phase or single-phase AC circuit must be made in
accordance with the regulations and standards.
The cable cross-section must be selected so that the
self-heating is limited to 15K.
Once the required cables have been routed,
the pre-installation is complete.
All manuals and user guides at all-guides.com
FI
LS
A generous distance (recommended is 0.5 m, depending
on the ambient temperature) between the eClick
and surrounding objects safeguards an adequate heat
dissipation and unimpeded use afterwards.

Routing the connecting cable

Route the cable of adequate conductor area to the site
chosen. In doing so, however, bear in mind that only cables
not exceeding 10 mm² in cross-section may be introduced
into the eClick (maximum bending radii). The routed cables
may therefore have to be rewired before they are inserted
into the eClick.
Caution
When the eClick is mounted in
the ePoleDuo, each and every
eClick must be provided with its
own RCD and circuit breaker. As
a consequence, the ePoleDuo
requires two separate supply lines.
You may then have to repeat the
procedure under the subsections
"Before installing" ff. to install
the second supply line.

Publicidad

Tabla de contenido
loading

Tabla de contenido