EN
5. Left/Right Foot Tube Installation
Remove two Bolts M8x16 (23), two Washers Ø8x Ø25(34) and one Connect shaft (21) from the
Left Handrail Arm (2) . Attach the Left Handrail Arm (2) to the Left Foot Pedal Tube (3) with one
Connect shaft (21) , two Washers Ø8x Ø25(34) and two Bolts M8x16 (23) that were removed.
Attach two Caps S13 (109) onto the Left Pedal Tube (3). Repeat above step to attach the Right
Handrail Arm(6) onto the Right Foot Pedal Tube( 4).
45