Track
Hanger
End Bracket
Jamb
End Bracket
Opening End
End Bracket
Floor Bracket
A
B
4. Installing Hangers INTO TRACK
5. Installing End Bracket
Header
Board
6. Installing Header Track Assembly
a) Measuring from floor up set nails at door height + 1/8" on
b) Slide End Brackets onto protruding nails.
c) Level Header Track Assembly.
d) Set nails and drive additional nails through remaining
7. Installing Split Jambs and Floor Brackets
NOTES: • Standard Jamb length is designed for use with 7'0" doors.
Split Jamb
a) Insert prong tabs from Floor Bracket into
b) Stand Split Jamb up so the wood facing is exposed on
c) Place remaining Split Jamb on prongs and nail to
opposite side of Header Track Assembly.
d) Secure bracket to floor.
e) Repeat steps for second set of Split Jambs. Position
From the open end of track, slide both Hangers into
track as shown.
Installing Hangers with Soft Close into track, refer to
Soft Close Instructions that are supplied with Soft Close.
Use two (2) #8 x 5/8" screws and attach end bracket to
the opposite end of Header Track Assembly.
both side jambs-leaving 1/8" of nail protruding from side
jambs; bracket will rest on these nails.
holes in end brackets.
• For 6'8" doors cut 4" off the bottom of Jambs. Make sure
the floor Bracket Prong can slide into Split Jamb.
• Models SLAL-250-PDKT-EXT-48, SLAL-250-PDK-6-EXT48,
SLAL-250-PK-6M-EXT48: For doors over 7'0"
up to 9'0" cut Jamb Extensions to desired
length, couple to Jambs using Jamb Splice
Brackets. Using #8 x 5/8" screws.
Split Jamb on flush end with wood exposed as shown.
drywall side and so jamb is flush against Header Track
Assembly and butts against Nailing Strip. Nail into place.
second set midway in pocket opening.