Assembly And Operation; Applications; Prior To Operation - Hitachi Koki CE 16SA Instrucciones De Seguridad Y Manual De Instrucciones

Ocultar thumbs Ver también para CE 16SA:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English

ASSEMBLY AND OPERATION

APPLICATIONS

For shearing steel plate, brass plate, copper plate, aluminum plate, stainless steel plate,
tin plate, and other metal plates, also leather and fiberboard.

PRIOR TO OPERATION

1. Power source
Ensure that the power source to be utilized conforms to the power source requirements
specified on the product nameplate.
2. Power switch
Ensure that the switch is in the OFF position. If the plug is connected to a receptacle
while the switch is in the ON position, the power tool will start operating immediately
and can cause serious injury.
3. Extension cord
When the work area is far away from the power source, use an extension cord of
sufficient thickness and rated capacity. The extension cord should be kept as short as
practicable.
4.Check the receptacle
If the receptacle only loosely accepts the plug, the receptacle must be repaired. Contact
a licensed electrician to make appropriate repairs.
If such a faulty receptacle is used, it may cause overheating, resulting in a serious
hazard.
5. Confirming condition of the environment:
Confirm that the work site is placed under appropriate conditions conforming to
prescribed precautions.
10
All manuals and user guides at all-guides.com
WARNING:
Damaged cord must be replaced or repaired.

Publicidad

Tabla de contenido
loading

Tabla de contenido