Sonntag Oku TurboSilence AXR10V Manual De Instalación Y Funcionamiento página 16

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

UNIT=MM
AXR10V
AXR13V
AXR17V
AXR21V
AXR26V
AXR32V
AXR32VT
AXR40VT
2.2.2. Heat pump installation.
 The frame must be fixed by bolts (M10) to concrete foundation or brackets. The
concrete foundation must be solid; the bracket must be strong enough and anti-rust
treated;
 The heat pump needs a water pump (Supplied by the user). The recommended pump
specification-flux: refer to Technical Parameter, Max. lift ≥10m
When the heat pump is running, there will be condensation water discharged from the
bottom, please pay attention to it.
2.2.3. Wiring & protecting devices and cable specification
 Connect to appropriate power supply, the voltage should comply with the rated voltage
of the products.
 Well earth the heat pump.
 Wiring must be connected by a professional technician according to the circuit diagram.
 Set breaker or fuse according to the local code (leakage operating current ≤ 30mA).
 The layout of power cable and signal cable should be orderly and not affecting each
other.
A
B
685
441
685
441
685
463
685
463
685
463
703
555
703
555
819
555
Above data is subject to modification without notice.
For installers and professionals
C
D
E
753
710
688
753
710
688
775
710
688
775
710
688
775
710
688
955
729
707
955
729
707
955
845
823
- 13 -
F
G
H
300
75.5
668
280
75.5
668
350
75.5
668
390
75.5
668
460
75.5
743
640
75.5
917
640
75.5
917
650
75.5
917

Publicidad

Tabla de contenido
loading

Tabla de contenido