Descargar Imprimir esta página

Robern Uplift Tech Ganging Kit Instrucciones De Montaje página 5

Publicidad

SEMI-RECESSED MOUNTING
3. Put the first cabinet in the left facing rough opening and slide towards the center 2 x 4 frame support. Screw in the right side first,
then continue installing all screws into the structural frame. Make sure cabinet is plumb, square, and level.
4. Clean edge of cabinet with alcohol, allow to dry.
5. Peel paper backing from spacer and apply on cabinet box.
6. Verify door opens and closes properly.
7. Put the next cabinet in the right facing rough opening and push to the left against the spacer and 2 x 4 frame support. Screw in the
left side first, then continue installing all screws into the structural frame. Make sure cabinet is plumb, square, and level.
NOTE: If you selected the optional Top and Bottom Kit (UTKxxD6ASR) proceed to step 8.
8. Peel paper backing from the top and bottom covers and apply to one of the top and bottom kits. Sticky side down, and align to the
edge of the support channels.
SEMI RECESSED GANGING INSTALLATION
9. Dry fit the Top and Bottom assembly before adhering to the frame. Apply side A first, then side B.
10. Complete installation using instructions supplied with cabinets.
3
7
© 2019 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation instructions
5
8
5
SEMI RECESSED GANGING INSTALL
Cabinet Box
Door frame, mirror
9
Top View
Spacer
A
B
Part no. 209-1318-A rev. 08/21/19
Ganging Kit

Publicidad

loading