(2) Secure reservoir horizontally using velcro strips and for the inline reservoir, use the inlet hose
to connect firmly to the drainage pipe.
(3) Fit breather tube to reservoir lid.
(4) Install pump drive unit above the ceiling where possible.
(5) An�-vibra�on assembly.
(6) Note direc�on of water flow.
1. False Ceiling
2. Evaporator Coil
3. Condensate Drain Tray
4. Silicone Tube
5. Conduit
5