FEUERHAND PYRON Manual De Instrucciones página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ASSEMBLY
The inner casing and the outer casing (top part) of
the Fire Barrel are already riveted to one another
upon delivery. The rest of the spare parts must
be safely screwed to the body. Make sure that all
parts are upright when assembled. Wear gloves
when assembling the product in order to avoid
leaving traces of sweat, fi ngerprints or dirt on the
product. These traces combined with heat can lead
to colour changes on the steel.
STEP 1:
Take the bottom of the Fire Barrel as well as one
of the mountings for the ash dish and one support
leg. Position the leg from below to the bottom of
the Fire Barrel, so that the drilling holes align.
From the inside, insert the mounting piece for
the ash dish into the bottom as a counterpart.
Then, place one of the screws provided from below
through the leg and the bottom, and screw it into
the nut that is welded on the mounting. Also fi x
the second screw from the outside though the
drilling into support leg and bottom and attach
it to the mounting. Then tighten the lower screw.
Do not tighten the top, outside screw yet, as the
body will be positioned here later on.
STEP 2:
Repeat this process for the two other support legs.
DEUTSCH
3x
ENGLISCH
FRANÇAIS
STEP 3:
Now place the bottom on the support legs and
insert the ash dish.
STEP 4:
Place the body with the openings provided onto
the screws between the mounting of the ash dish
and the bottom. Now tighten the outside screws.
Insert the charcoal grate.
ESPAÑOL
中文

Publicidad

Tabla de contenido
loading

Productos relacionados para FEUERHAND PYRON

Tabla de contenido