Renfert POWER steamer 1 Guia De Inicio Rapido página 18

Ocultar thumbs Ver también para POWER steamer 1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 43
Filling the pressure tank
⇒ Unscrew the tank cap (1).
en
⇒ Using a container, fill the pressure tank slowly with drinking water.
⇒ Only fill with the required quantity in accordance with the recommended fill quantity.
Recommended fill quantity, see Chap. "Technical data" at the end of these instructions.
Danger of scalding!
Excess water remains in the funnel-shaped upper housing.
This must be removed before operation.
⇒ Wipe off / remove excess water in the funnel-shaped upper housing.
⇒ Screw in the tank cap and tighten until it is finger tight.
The POWER steamer 1 can be operated using both drinking water and distilled or deionized water.
If the unit is a POWER steamer 2 and if it was connected to the water supply, it fills automatically
after it is switched on.
Electrical connection
⇒ Insert the power plug into a building electrical socket.
♦ All the LEDs light up.
The unit can be switched on using the ON / OFF button as soon as the LEDs go out.
Operation
Switching on / off
Switching on:
⇒ Switch on the unit by pressing the ON / OFF button (3).
♦ The "Heating / Ready for operation" indicator (5) lights up in orange, the unit heats up.
♦ POWER steamer 2: The tank fills automatically.
♦ Once the working pressure has been reached, the "Heating / Ready for operation" indicator (5) lights
up in green.
As a result of filling, the thread of the tank cap contains water. This audibly turns to steam during
heating.
How long it takes for the unit to heat up also depends on the mains voltage applied. If the unit is
cold and filled with 3 l of cold water, it could take between 20 and 40 minutes.
Switching off:
⇒ Briefly press the ON / OFF button
♦ The heating is switched off.
♦ All indicators are switched off.
⇒ POWER steamer 2: Turn off the water supply.
POWER steamer 2:
In the case of the POWER steamer 2, the pressure tank is automatically filled to the fill level probe if nec-
essary, after the unit is switched on.
Depending on the available water pressure, filling is carried out in several stages.
Steam cleaning
⇒ Wait until the working pressure has been reached, the "Heating / Ready for operation" indicator (5)
lights up in green.
⇒ Hold the steam nozzle in the sink and drain the condensate from the steam hose by briefly pressing the
steam button (8).
⇒ Steam cleaning objects
Wear appropriate personal protective equipment when steam cleaning!
Observe the following when steam cleaning:
- 6 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Power steamer 2

Tabla de contenido