Initial Start-Up; Setting Up And Switching On - Waeco ASC 6100G Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

12 Initial start-up

12 Initial start-up
This chapter describes the procedures you have to carry out before you can operate the A/C service unit.
12.1

Setting up and switching on

Note In order to achieve correct measurements, the A/C service unit must be placed on a level flat sur-
face during operation. Ignore any error codes which occur during commissioning
page 28) and skip by pressing ENTER.
1.
Wheel the A/C service unit to the workplace and lock the front wheels.
2.
Mount the service hoses.
3.
Set the length of the service hoses
4.
Connect the A/C service unit to the power supply.
5.
To switch the A/C service unit on, set the main switch to I.
The switch-on delay runs for 35 s and the housing is ventilated. The software version number then appears
in the display for several seconds:
Dometic Germany GmbH
ASC6400G
LE
SN000000
SW:
Software status
DB:
Database
SN:
Serial number
LF:
Language file
6.
Once the start-up procedure is complete, the A/C service unit requires the selection of the refrigerant
(Selecting the refrigerant
12.2
Selecting the refrigerant
On initial start-up the A/C service unit displays the refrigerant selection menu.
1.
In the refrigerant selection menu use the cursor keys
ing example R153A).
Refrigerant
R-134a
R-1234yf
R-513A
2.
Press ENTER to confirm.
The chosen refrigerant is displayed.
Confirm
Refrigerant
R-513A
ENTER-OK
3.
Press ENTER to confirm the selection and follow the instructions in the display and provided here:
Please install HP/LP
connection hose!
Once done, press OK.
ENTER-OK
8
(Setting the length of the service hoses
SW
LE640004
DB
mgas2107
LF
mgas0081
on page 8).
Yes
No
on page 9).
or
to select the desired refrigerant (in the follow-
(Troubleshooting
on

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9103303104

Tabla de contenido