Descargar Imprimir esta página

Preparation - Sub-Zero Classic Serie Guia De Instalacion

Ocultar thumbs Ver también para Classic Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Site Preparation

Preparation

Uncrate the unit and inspect for damage. Remove the
wood base and discard the shipping bolts and brackets.
Remove and recycle packing materials. Do not discard the
kickplate, anti-tip brackets, and hardware.
Completely retract the front leveling legs to allow the unit
to be moved into position. The front and rear leveling legs
can be adjusted from the front once the unit is in position.
Remove the drain pan from the base of the unit to avoid
damage and to allow for proper placement of the appli-
ance dolly.
The grille assembly should be removed prior to moving the
unit. To remove, pull out on the bottom edge of the grille
and rotate upward. Loosen the back two grille mounting
screws and remove the front two grille mounting screws.
Refer to the illustrations below. With the grille held firmly,
pull forward to remove.
BACK GRILLE
SCREW
FRONT
GRILLE SCREW
Grille removal
Grille mounting screws
subzero.com | 9

Publicidad

loading