Descargar Imprimir esta página

Commissioning And Initial Verification; Loading The Goods Into The Refrigerator Cabinet - Tefcold MD-RANGE 702 Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

The equipment must not be moved when loaded with products
The maximum voltage variation of the supply line must be +/- 6% of the nominal value
The power supply line must be adequately sized with respect to the power required by the appliance
as indicated on the licence plate; It is NOT the responsibility of the manufacturer that the electrical
system upstream of the power outlet for the cabinet has regulated cables and a suitable cross-section
for the electrical load installed
The replacement of the power cord on the appliance is reserved for qualified technical personnel
It is important that the installation area has a flat surface. The cabinet can be lifted with the wooden pallet with a
manual or automatic transport device or using the motor casing AFTER REMOVING THE MOTOR's
VENTILATION GRILL. The cabinet is equipped with 4 rollers to facilitate manual movement. On request it is
possible to equip the cabinet with pivoting wheels with a brake. Do not push impetuously and apply an incremental
force until you reach the right speed of movement of 10cm/s. Always push with your hands in the middle position on
the height of the device. Once the position of the CABINET has been defined, act on the levelling feet to lock it in
place (FIG.6). Check that the CABINET is stable and rests entirely on the floor surface. Remove protective films and
packaging residues. After cleaning the appliance with water and neutral detergent, make sure that the floor is well dry
and clean. Use side hooks to place the shelves, if the hooks are at the same level the shelf will be horizontal, otherwise
it will be inclined (FIG.15).
If you plan to use inclined shelves, shelf product stops must be used (FIG.9).

15. COMMISSIONING AND INITIAL VERIFICATION

Check that the environmental conditions are compatible with what is required for the correct functioning of
the CABINET, remove the power supply from the power line. Plug the power cord into the socket, restore
the power supply. Monitor the value of the internal temperature using the display on the device. The cabinet
takes about 1 hour to reach the correct storage temperature. Wait for the device to reach this before loading
any food into it.

16. LOADING THE GOODS INTO THE REFRIGERATOR CABINET

Caution! do not overload the shelves; risk of injury or damage. The maximum load is
50kg/m for each shelf
Do not obstruct the air outlets or inlets
Do not climb on the cabinet or on the shelves to load the highest shelves (FIG.5). Use
standard steps
When present, open one door at a time to perform loading operations
Load the cabinet in an orderly manner, leaving at least 25mm between the goods and the top
shelf (FIG.3 and FIG.4)
Do not exceed load limits
Loading the appliance as evenly as possible helps to minimize electricity consumption and promote the proper
preservation of the goods (FIG:3 and FIG.4). Carry out the food rotation to facilitate the withdrawal of the goods
stored in the CABINET the longest. For convenience you can remove the front plexiglass to perform the loading
(FIG.12).
Moving the shelves, tilting them, and loading them approximately may reduce the declared performance of
the appliance only in ISO 23953 configuration
11

Publicidad

loading

Productos relacionados para Tefcold MD-RANGE 702

Este manual también es adecuado para:

Md-range 1002Md-range 1402Md-range 1902