Descargar Imprimir esta página

Style selections SGY-GHR1 Manual Del Usuario página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
5a. If you are drilling into the studs, use a 3/16"
drill bit to drill pilot holes on the marks you
made.
5b. If you are drilling into drywall or masonry, use
a 3/8" drill bit to drill the holes on the marks
you made. Tap the plastic anchors (EE) into
the holes.
5c. Use screws DD and a Phillips screwdriver to
attach the mounting clips securely to the
surface.
6. Open the mounting clips and hang the hose
reel (A), locking the mounting clips (E) in place
after the hose reel has been hung.
Hardware Used
DD
EE
Crank Assembly
1. Remove screw FF from the shaft and slide the
crank handle (C) onto the shaft. Insert screw
EE and tight down with Phillips screwdriver.
Hardware Used
x 1
FF
Attach the Leader Hose
1. Inspect threaded female connector on hose
reel (A), confirm that rubber O-ring is properly
seated.
2. Connect threaded male connector end of
leader hose (B) to threaded female fitting on
hose reel spool.
3. Tighten by hand until snug (clockwise).
4. With adjustable pliers or wrench tighten fully.
x 4
x 4
8
9
10
8
A
FF
C

Publicidad

loading