Descargar Imprimir esta página

Final Stages; Function Test - Airton 409730 Manual De Instalación

Aire acondicionado/ bomba de calor/aire

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 56
EN

FINAL STAGES

Once completed, secure the pipes, wiring and condensate pipe with insulation tape.
1. Place the pipes, wiring and condensate pipe properly.
2. Insulate the refrigerant line fittings well with the insulation sleeves and insulation tape.
electrical cable
electrical cable

FUNCTION TEST

1. Turn on the system and press the ON/OFF button on the remote control to operate it.
2. Press the MODE button to select AUTO, COOL, DEHUMIDIFY, FAN and HEAT to ensure that the different modes
are working properly.
46
Refrigeration
insulation
line
sleeves
Refrigeration
line
Condensate pipe
Pipe
clamp
insulating sleeve
Piping
Piping
insulating tape
16

Publicidad

loading