Step 17
å
IMPORTANT: You will need someone's help in this step.
å
Fasten the TOP (D) to the ENDS (A and B). Use ten BLACK 9/16" LARGE HEAD SCREWS (1S) through the LIFT TABLE
MECHANISMS (23M) and into the holes in the ENDS.
å
NOTE: Be careful when lining up the holes in the MECHANISMS with the holes in the ENDS as to not damage any parts.
You should start each SCREW a few turns before completely tightening any of them.
å
Then, fasten the TOP (D) to the ENDS (A and B). Use two BUSHINGS (91M) and two BLACK 3/4" PAN HEAD
SCREWS (85S) through the exact holes shown in the LIFT TABLE MECHANISMS (23M) and into the holes in the ENDS.
å
NOTE: Do not overtighten the SCREWS (85S).
å
NOTE: The BUSHINGS allow the LIFT TOP to close lightly. Over time, after opening and closing the LIFT TOP, the
BUSHING will allow the LIFT TOP to close completely.
BLACK 9/16" LARGE HEAD SCREW
(10 used in this step)
91M
www.sauder.com/services
1S
BLACK 3/4" PAN HEAD SCREW
(2 used for the BUSHINGS)
23M
A
85S
D
91M
414444
23M
These four holes
must be here.
B
Do not use.
1S
Page 21