Descargar Imprimir esta página

Pre-Start Up Procedure; Operation Of Poolfresh System; Control Panel Layout - Davey PoolFresh Instalación E Instrucciones De Funcionamiento

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 81
PRE - START UP PROCEDURE
Before operating your PoolFresh chlorinator ensure the following items have been added to your pool:
• SALT - Load salt into the pool at a minimum rate of 40kg per 10,000 litres (0.4%). Connect vacuum system
and slowly vacuum until salt dispersal is complete. Place vacuum head into deepest end of the pool and
allow vacuum to continue for a further 2 or 3 hours. Salt should now be completely disolved.
• CHLORINE - For a new pool installation that has not been chlorinated, add sufficient Chlorine (liquid or
granular) to achieve a reading of 3 ppm (with a suitable test kit), or run the chlorinator system continuously
for at least 24 hours or until a reading of 3 ppm is reached.
• STABILISER - It is essential that pool stabiliser be added and maintained at the rate of 30 - 50 mg/l (30 -
50 ppm) at all times. Do not exceed 80 ppm. If you are using an ORP controller, the stabiliser level should
not exceed 15ppm.

OPERATION OF PoolFresh SYSTEM

Cell Output is expressed as a percentage. Set the system control to the percentage output required and the
unit will automatically adjust the cell output to the set level. The unit is fitted with an electronic control and
warning system. This regulates the output of the unit to the preset maximum and changes cell polarity as
indicated by the +/- LED indicator. This will alternate over a number of hours or days depending on how the
unit is set to operate. The warning system consists of one Operation LED which will glow red or orange to
indicate possible faults with the unit or damaging operating conditions.

CONTROL PANEL LAYOUT:

Once the salt level in the pool is correct the unit may be switched On. (Note: Once the unit starts there is
a short time delay until the cell operates to ensure filtration system is primed with water) At this point
the Operation LED should be Green; if red refer below. Once the unit is powered ON, some LEDs quickly
ramp up to the last output set point. During normal operation, pressing the ↑ button increases the output set
point and ↓ button decreases the output set point.
Each solid green LED represents 10% while the flashing green LED represents 5% increment. (e.g. Output
LED 1-4 ON and 5 Flashing = 40% + 5% = 45%)
The RED or ORANGE Operation LED will indicate a number of different possible problem situations:
Operation LED Possible Problem
Salt Level Below Minimum
Orange LED
Cell is Calcified
Water temperature very cold
Red LED
There is a problem with water flow
Action
Add Salt
Clean Cell
Add salt to compensate for cold water
Check pump / pipes for blockage or damage.
Check that flow sensor is connected properly and
in the right direction.
7

Publicidad

loading