Descargar Imprimir esta página

Goodwe GM1000D Guía De Instalación Rápida página 74

Ocultar thumbs Ver también para GM1000D:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21
Commissioning
07
Power ON
Step 1 Connect the smart meter cables.
Step 2 Power on the inverter and make sure that the inverter is working normally. Then the
smart meter is powered on.
Indicator
Type
Status
Steady on
Off
Steady on
Blinking
Blinking
Blinking 5 times
Reset Button
Press Time
< 3s
5s
>10s
Description
Power on
Power off
Importing from the grid.
Exporting to the grid.
Communication is OK.
The meter is resetting
Description
Reset the smart meter.
Restore factory settings.
Restore factory settings and clear the historical energy data.
Quick Installation Guide V1.0 -2022 -09-05
72

Publicidad

loading

Este manual también es adecuado para:

Gm3000Gm1000