Descargar Imprimir esta página

CRAFT+MAIN COVE NEO-ANGLE Manual De Instrucciones página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION PROCEDURE / STEP 3
1.
Insert fixed panel (3) into wall channel (2) slot.
2-3. Place wall channel gasket (5) between the fixed panel (3) and the channel (2).
Use the squeeze gasket tool (22) to push the gasket snuggly into place.
4-5. Note: he maximum adjusting range of both wall channel (2) is 5/8" (16mm).
LEFT HAND ASSEMBLY
RIGHT HAND ASSEMBLY
- 5 -

Publicidad

loading

Productos relacionados para CRAFT+MAIN COVE NEO-ANGLE