Descargar Imprimir esta página

XCell BC-X500 Instrucciones De Operación página 11

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.
Make sure that the polarity of the batteries is correct (+/-),
according to the symbols in the charging slot
5.
The charging process starts automatically. The charging
status of each battery is indicated by the LED control
lamps. It is not necessary to insert the batteries at the
same time, as the charging processes of the batteries are
controlled independently.
6.
If the LED starts blinking a defect is detected
7.
It is normal for the batteries to heat up during the charging
process.
8.
When the battery is fully charged, the device automatical-
ly switches to pulse conservation charging. This function
prevents self-discharge of the battery without overchar-
ging.
Deutsch .
LOADING TIMES
Type
AAA
AA
9V
The charging currents apply per battery bay.
Charging time = (Battery capacity mAh / Charging current mA) * 1,2
English
. Français . Español . Italiano
Charging
Battery
current
capacity
500mA
800mAh
500mA
2100mAh
13mA
200mAh
Charging time
approx.
2h
5h
18.5h

Publicidad

loading

Este manual también es adecuado para:

148089