Commissioning
20
7.1 Preparing for commissioning
Before turning on the pump, make sure of the following
points:
Necessary operating requirements
Pump
- Connect all hoses correctly
Pump
- Data of the voltage supply system are consis-
tent with the details on the type plate of the
power supply.
- Pump outlet not closed or restricted.
Tab.13: Operating requirements for commissioning
7.2 Perform commissioning
CAUTION
Translation of Original Operating Instruction, KNF 323241-323242 06/22
Laboratory pump Laboport® N96
Risk of injury from bursting hoses dur-
ing pressure applications due to exces-
sively high temperatures
When operating the pump in pressure
applications, hoses that are not de-
signed for the head temperatures of
the pump at the respective operating
point could become porous and burst.
à
Use temperature-resistant pressure
hoses at the pneumatic connec-
tions.
à
Wear protective equipment if nec-
essary (e.g., safety gloves, hearing
protection).