Descargar Imprimir esta página

Health O Meter 499KL Manual Del Usuario página 71

Ocultar thumbs Ver también para 499KL:

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS (CONTINUED)
5. Obtain the scale pillar and
locate the load cell cable.
Place the pillar above the
platform and cover with the
display head facing the scale
platform. Carefully pull the
cable connector from the
bottom of Column B and plug
into the RJ jack on scale
platform C. Once plugged in
completely, lower the pillar
into the cover.
Alternate Method of Plugging in the
Load Cell Cable:
If having difficulty plugging the cable
into the port, complete step 7 then
you may also access the load cell
cable via the door on the rear of the
cover. Use a Phillips screwdriver to
remove the door at the back of the
platform base then plug in the load
cell cable and replace the door.
6. Keep a firm hold on the pillar
and platform and place the
scale on its side. Locate the 4
column mounting screws
previously removed in step 1.
Ensure that washers are
located between the screw
heads and the scale platform
C screw holes. Insert the 4
screws through the bottom of
scale platform C screw holes
and into Column B. Using a
Phillips head screwdriver,
tighten the screws to secure
Column B to the base of
platform C.
7. On the underside of the
platform, feed the wire for the
power adapter port through
the base and plug into the
port. Note: Ensure the wire is
tucked into the slot in the base
as shown. The scale is now
assembled and ready to use.
UM499KL REV 20210305
Alternate method to plug cable into port:
71
Back to Home Page

Publicidad

loading

Este manual también es adecuado para:

499klhr