Descargar Imprimir esta página

Simon, Evers & Co K 658791 Instrucciones De Servicio página 90

Publicidad

2. INSTALLATION OF LIFT TABLE ON THE FLOOR/GROUND OR IN A PIT
Double or triple vertical
by means of expander bolts or similar,
We also recommend that all other lift
table types,with the exception of mobile units,are securely
affixed on the floor to Prevent unintentional movement
Mechanical/electrical installation
1.The base frame of the lift table is not as standard self
-supporting .It is important that the flooring is flat and stable and
that the installation area or pit, when necessary, is well drained.
2. Utilize a lifting sling through the scissor package. Tie the base
frame to the platform or the scissor mechanism. Locate the table
into the desired position. Turn the fixed arm end to the side where
the load will be moved on or off at upper level. See picture below.
3. Check the operation of the safety frame on all sides.
4.The control device should be positioned so that the operator has a
clear view over the lift table and the load at all times when the lift
is operated.
scissors tables must be
fixed to the floor/ground
Pit drawing
A. Pit length=a+30mm
B. Pit width=b+30mm
H. Pit depth=closed
height of table+5mm
a. Platform length
b. Platform width
c. Drainage hole (when required)
d. Tube for external cables and hoses φ60mm
h. Lowest height
Loading/unloading at
the fixed arm end

Publicidad

loading