Descargar Imprimir esta página

Rockwell Automation Allen-Bradley 198E-C2S4 Instrucciones De Montaje página 2

Publicidad

Assembly of Direct On-line Starters
1
Attach the overload relay to the contactor
4
Snap the 800F contact blocks onto the
device support:
• Pos. 1 (left): N.O. contact
• Pos. 2 (right): N.C. contact
Snap the side-mount auxiliary contact
to the right side of the contactor.
2
Snap the starter combination
onto the device support
5
Do the control wiring according the wiring diagram / wire table.
Mount the 800F push button operators into the cover.
(2)
3
Screw down the device
support into the enclosure

Publicidad

loading