Operation; Start Satellite; Stop Satellite; Rinsing The Chemical Supply/Injector System - Ecolab Hybrid Penta SU11PD22 Instrucciones De Uso

Ocultar thumbs Ver también para Hybrid Penta SU11PD22:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Operation

8.1. Start satellite

• Make sure that the water and air supply to the unit
is open, see layout drawing. In case of central
chemical supply this must be activated too.
• Select requested function. Use the unit according
to the "User Guide".
Never activate the spray handle while using the
switch to select a function.

8.2. Stop satellite

8.3. Stop satellite
• Close the water supply (layout drawing).
• Close the air supply (layout drawing).
• Deactivate chemical supply by pulling up the suc-
tion hose or removing the userpack. In case of
central chemical supply this must be deactivated
too.
It is important to shut off the water and
air when the unit is left after use .
If the air supply is open when the unit are not in use,
air may seep into the water pipe. If this is the case the
system may have to be bled again.
It may be necessary to bleed the pipes and the unit
again after it has been closed for a longer period of
time (holidays, and the like).

8.4. Rinsing the chemical supply/injector system

CAUTION
The chemical supply must always
be rinsed thoroughly after use
Remains of detergents or disinfectants can clog the
injector so it needs to be rinsed or replaced.
The following procedure will clean the chemistry sup-
ply for detergents and/or remains of disinfectants
• Remove User Pack or standard can
• Insert a User Pack or can containing clean water.
In case of a can make sure the suction hose is
submerged in water.
• Open the spray gun/outlet valve and keep it open
until the injector has been rinsed through (approx.
30 seconds).
This procedure should be
followed both on the detergent
and the disinfectant side (if this is
installed).
9. Maintenance, Trouble shooting,
Service

9.1. Preventive maintenance

Depending on usage, maintenance should be un-
dertaken by an authorised service engineer at least
once a year in order to prevent defects and failure of
operation. Authorised engineers are persons who due
to their skills and experience have sufficient knowl-
edge of the Hygiene Systems and are confident with
the state work safety regulations, accident preventing
regulations, lines and generally acknowledged techni-
cal regulations such as DIN-norms and VDE-provi-
sions. For your safety, this cleaning unit has been
manufactured according to all relevant regulations
valid in the EU and therefore it has been supplied with
the CE-marking. For further information, please refer
to the service department.

9.2. Replacing gaskets

When the gasket and o-ring surrounding the ball valve
is dismounted during service or maintenance they
needs to be replaced.
All four gaskets need to be replace at
the same time to ensure the correct fit
of the ball valve.
The gasket and o-ring with the block is show in illus-
tration 111005860 and the sparepart kit 110005832
page
To fix in the gaskets and o-rings during mounting in
check valve and the like (see illustration), please add
a small amount of waterproof grease to the gasket
and o-rings before mounting the check valve in the
main block.
110005860
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hybrid penta su21pd22Hybrid penta supd21Hybrid penta supd22Hybrid penta supd32Hybrid penta supd22 dw

Tabla de contenido