Descargar Imprimir esta página

HAMPTON BAY LDS-BF3001 Guía De Uso Y Cuidado página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation - New Construction(continued)
4
Connect the duct
Connect a 6 in. circular duct (not supplied) and vent to the duct
connector. Secure it with duct tape (not supplied) or a clamp
(not supplied) to make the connection secure and air tight.
Insert the duct connector back to the fan housing (A) follow the
guide slot from left to right. And it will be in place with a "click"
sound. Please secure it tightly.
NOTE: If you have to connect to 4in. circular duct, please use a 6in.
to 4in. duct adapter (not supplied).
5
Finish the ceiling work
 After electrical and construction inspection is completed,
the dry wall ceiling can be installed.
 Cut the ceiling hole with the cut-hole template (H) or the
size 11*12.17inch (280*309mm). Ceiling hole should be
aligned with the inside edge of fan housing.
NOTE: MAKE SURE ONE EDGE OF THE OPENING IS FLUSH WITH THE
JOIST FOR INSTALLATION.
 Important: Cover and seal up all gaps with duct tape
NOTE: That it is common practice in heating and ventilation systems
using sheet metal ductwork and fittings or flexible duct work tubing to
use duct tape or aluminum tape to ensure air tight seals and improve
efficiency.
6
Install the grille with light
Attach the grille by squeezing one spring together and
inserting the springs into the spring guides in the fan
housing (A) firstly.
Connect LED wire to the plug in the fan housing.
Then insert another spring and push the grille (B) up
against the ceiling.
Check that the installation is secure and safe from
falling objects.
JOIST
Duct tape
Gaps
Plug
10
TEMPLATE
Align this side with joist side
Duct tape

Publicidad

loading

Este manual también es adecuado para:

317297137