ASSEMBLY INSTRUCTIONS
13. Move the Vertical Standards (C) to the side to
reveal the marks made in the previous step. Using
5/16" drill bit to pre-drill holes into drywall. Use a
1/8" drill bit if this is in a stud. Do not drill through
the metal brackets.
If you are unsure if a stud is located
PRO TIP
behind markings, use 1/8" drill bit to
drill all holes. If no stud is present,
then use 5/16" drill bit to make holes
larger for drywall anchors.
14. While the standards are shifted to the side,
install Drywall Anchors (AA) into pre-drilled drywall
holes.
Hardware Used (Pack B)
AA
Drywall Anchor
Use a rubber mallet to lightly tap
PRO TIP
Drywall Anchors (AA) into the drywall.
13
14
x 2
12
AA
2x