Descargar Imprimir esta página

GreenWorks CSF401 Manual Del Operador página 9

Ocultar thumbs Ver también para CSF401:

Publicidad

Idiomas disponibles

Idiomas disponibles

8.3
ASSEMBLE THE GUIDE BAR AND
THE CHAIN
1. Loosen the chain cover by turning the chain cover
knob counterclockwise.
2. Remove the chain cover.
3. Put the chain drive links (21) into the bar groove
(20).
4. Put the chain cutters (22) in the direction of the
chain operation.
5. Put the chain in position and make sure that the
loop is behind the guide bar.
6. Hold the chain and bar.
21
20
7. Put the chain loop around the sprocket (17).
8. Make sure the chain tension pin hole on the guide
bar fits correctly with the bolt (16).
18
English
22
19
9. Install the chain cover.
10. Tighten the chain. Refer to Adjust the chain tension.
11. Tighten the chain cover knob when the chain is
correctly tensioned.
If you start the chain saw with a new chain, have a
test for 2-3 minutes. A new chain gets longer after the
first use, examine the tension and tighten the chain if
necessary.
8.4
INSTALL THE BATTERY PACK
WARNING
If the battery pack or charger is damaged, replace
the battery pack or the charger.
Stop the machine and wait until the motor stops
before you install or remove the battery pack.
Read and understand the instructions in the
battery and charger manual.
1. Align the lift ribs on the battery pack with the
grooves in the battery compartment.
2. Push the battery pack into the battery compartment
until the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
8.5
REMOVE THE BATTERY PACK
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
9
OPERATION
Remove the battery pack and keep hands clear of the
lock out button when you move the machine.
9
NOTE
NOTE
EN

Publicidad

loading

Este manual también es adecuado para:

2031220322