Descargar Imprimir esta página

Hitachi P-N23NA2 Manual De Instalación Y Funcionamiento página 17

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21
INSTALLATION
Air Panel
Corner
Connecting Cable
Corner Cover
with Sensor
Relay
Connector
f. Install the corner band onto the projection as shown
below.
Projection
Band
6.6 CONTROL SETTINGS AFTER INSTALLING CORNER COVER WITH MOTION SENSOR
(PC-ARFG-E EXAMPLE)
Depending on the location of the corner with motion sensor,
setting on the wired controller is also necessary.
1 Press "Menu", then "Service Installation" and enter de
Password "0-0-0-0". Press the "Installation Menu" and the
"Test Run" menu will be displayed.
7
PMML0569 rev.1 - 03/2022
Cable Band
Wiring Cover
Cable Band
g. As you insert wiring into the corner, insert the other two
fixing hooks corresponding to points Ⓐ (into the squared
slots on the air panel) and slide the corner cover in the
direction of the arrows at points Ⓐ. Then, insert the fixing
hook into the squared slot (of the air panel) at point Ⓑ.
Fixing hook
B
Fixing hook
A
?
N O T E
Catch securely the band onto the projection. If not, the corner cover
may fall down when removing it so that may cause injury.
Catch securely the fixing hooks of the corner cover to the air panel. If
not, the fixing hooks will be damaged.
Function Menu
Enter Password
Screen Display Setting
Service & Installation
6
0
Cool
Fan Speed
OK
Confirm
Service & Installation
Service Menu
Installation Menu
Check Menu
OK
Enter
A
B
A
Menu
0
0
OK
Louver
Menu
Help
Back
(Mon) 16:30
Back

Publicidad

loading

Este manual también es adecuado para:

P-ap160ka3P-ap160nae2